Northside, Sewer Pump Station
BARCON is undertaking the complete civil works for the installation of a new sewer pump station. The project involves the construction and installation of a precast wet well and valve chambers, with excavation works reaching depths of 10 meters, supported by shoring and benching. A key feature of the development is an 18KL storage vessel measuring 20m x 3.5m x 3.75m. In addition to the core pump station infrastructure, the scope includes associated sewer and stormwater connections, as well as the construction of a concrete driveway, landscaping, and perimeter fencing to complete the site works.